Export readiness for a robotics pilot

Before an overseas pilot, the supplier and the receiving operator need a shared file describing what will ship, how to accept it, and who can resolve a fault. RobotBay’s checklist helps both teams prepare that handover.

RobotBay ·

Identify what the buyer will receive

List model and revision, firmware, interfaces, power input, included accessories and spare parts. Attach dated manuals and dimensional drawings. Ask the receiving engineer to verify compatibility against the intended installation.

Agree the acceptance test

Specify one representative task, the site conditions, the acceptance threshold, the observer and the evidence to retain. For each specification that matters to the task, attach its source and identify what still requires a local test.

Close the support gaps

Name the support contact, working hours, escalation path and spare-parts lead time. Assign an owner and due date to every unresolved item. Have the importer confirm destination-specific requirements with the appropriate authority before shipping. This worksheet records preparation and does not establish market approval.